Description

Cost of Project: $487,872

Scope of Work: Demo the existing saloon fixtures, flooring, close up plumbings valves, install storefront, wainscoting, wood shelving, pipe displays, open ceiling as wells as redesigning drop ceilings, electrical, plumbing for restrooms, adding interior walls, stained polished concrete floors, re-duct and move the existing HVAC.

Duration of Construction: 121 Days

"Fantastic team, outstanding Results, and completed the work less than the original estimate. The project was finished two weeks late, because the city red tagged the electrical panel twice because of the new codes, but we are still pleased with outcome."
JAN MOORE

Details

Client

LEVI STRAUSEE& CO

Date

3/11/2013

Category

Launch Project